01 · 2-3 days
Full scenic transformation
2-3 days. Complete set design, construction, AV and strike.
This format is suited to conventions, product launches or gala dinners where the venue must become an entirely different world. Every surface · walls, floor, ceiling · is treated as part of the scenic brief. A full transformation at a Lisbon waterfront venue typically requires 48 hours of build time before delegates arrive, so early access negotiation with the venue is factored into our production schedule from day one. The scenic concept is developed from your brand guidelines and communication objective, not from a library of pre-built sets.
On request · 2-3 days